The Rizhao to Qufu section of the South-Shandong high-speed railway has entered the trial operation stage (as shown in the figure). As an important part of the national "Eight vertical and eight horizontal" railway network, the South-Shandong high-speed railway runs from Rizhao in the east to Linyi, Jining and Heze in the west, connecting with Lankao South Station of Zhengxu high-speed Railway in Henan Province, with a total length of about 494 kilometers. The Rizhao to Qufu section of the South-Shandong high-speed railway has entered the trial operation stage (as shown in the figure). As an important part of the national "Eight vertical and eight horizontal" railway network, the South-Shandong high-speed railway runs from Rizhao in the east to Linyi, Jining and Heze in the west, connecting with Lankao South Station of Zhengxu high-speed Railway in Henan Province, with a total length of about 494 kilometers. Since the construction of the project started on January 25, 2017, more than 40,000 tons of Shansteel products have been used in the construction of high-speed railway stations and roads and Bridges along the line. Since the construction of the project started on January 25, 2017, more than 40,000 tons of Shansteel products have been used in the construction of high-speed railway stations and roads and Bridges along the line.